Available services

Processo de construção (2ª fase) do troço entre a ponte do Vascão e o cruzamento com a Estrada Nacional nº 124 (proximidades de Balurcos)

Description level
Instalation unit Instalation unit
Reference code
PT/ADFAR/ACD/JAE/112/0030
Title type
original
Date range
1947 Date is certain to 1950 Date is certain
Dimension and support
1 pt.
Previous location
JAE 150
Language of the material
Português
Type of container
Outro
Creation date
17/03/2011 00:00:00
Last modification
04/08/2011 10:44:25