Available services

Processo de construção do lanço entre as estações de caminho de ferro de Odemira e Santa Clara-Sabóia: troço entre a ribeira de Totenique e a ponte sobre a ribeira de Telhares (final do lanço)

Description level
Instalation unit Instalation unit
Reference code
PT/ADFAR/ACD/JAE/109/0054
Title type
original
Date range
1938 Date is certain to 1941 Date is certain
Dimension and support
1 pt.
Previous location
JAE 164 (vol. 1)
Language of the material
Português
Type of container
Outro
Creation date
17/03/2011 00:00:00
Last modification
04/08/2011 10:44:25